STEP 1 |
Choose a level site. Carefully unpack the tent and
spread it out flat, with the teal roof and pole sleeves
facing upwards. Assemble all pole sections. See photo #1
|
|
STEP 2 |
Locate the two long roof arch poles, and insert
completely through the pole sleeves, so that all 4 ends
extend out beyond the pole sleeve ends. See Photo #1
|
|
STEP 3 |
After the roof arch poles are completely inserted,
attach all four vertical corner poles to the roof pole
ends, with the ScreenRoom still laying on the ground. BE
SURE all pole sections are completely engaged.
|
|
STEP 4 |
With two people, grasp the poles with one hand above the
bend in the vertical pole, and the other hand below the
bend. See photo #2 |
|
STEP 5 |
Simultaneously lift two adjacent corners as shown. While
lifting, pull the pole sleeves towards you and down past
the bends in the vertical corner poles. Be Sure to lift
evenly with both hands to prevent damaging the pre-bent
vertical corner pole. See photo #2 Be sure to insert the
pole tips in the bottoms of the vertical corner poles
into the grommets in the webbing on the lower corners of
the ScreenRoom. |
|
STEP 6 |
Repeat Step 5 on the opposite two, adjacent corner
poles, again being sure to pull the tent pole sleeves
and roof into position as you raise the last two poles.
Be sure the pole tips are secure in the grommetts in the
webbing on the four lower corners of the ScreenRoom.
|
|
STEP 7 |
Once the unit is set up, position as desired. Secure the
unit with ground stakes and guy-lines supplied with the
ScreenRoom. Start by securing the four corners with
ground stakes, pulling the corners tight. Next put
ground stakes in the webbing loops along the bottom
sides.
See photo #3 |
|
STEP 8 |
Attach the four corner pole clips to the poles as as
shown in Photo #4 |
|
STEP 9 |
Now
you can deploy the awnings out, rolled up, or just leave
down. Your ScreenRoom is equipped with one set of awning
poles.
Additional sets can be purchased by calling
888.700.TENT See Photo # 5 |
|
STEP 10 |
At
this time, you should deploy the adjustable guy-line
that came with the unit. Start with a minimum of one
from each corner. More can be added to the triangular
shaped guy-line attachment points along the upper side
wall seams. See Figure #1 for proper use of the guy-line
tensioners.. |
|
STEP 11 |
If
you purchased the optional rainfly, it can be deployed
as shown in Photo #6. With two people standing on
adjacent sides and holding the rainfly corner straps,
pull the rainfly over the top of the ScreenRoom, then
secure the Rainfly straps to the d-rings on the lower
corners and tighten. See Photo #6 |
|